2 Tahun 2019 Ikra Nasrul Khuri Saputra, Nunung Widyaningsih, Bambang. Integrasi Crashing Program Dan Building Information Modelling Pada Proyek High Rise Building Jurnal Konstruksia Vol 10 No. As for some suggestions given in dealing with the problem, namely 1) introducing the application, 2) replacing the information system designed by the author, 3) direct testing of the application, 3) developing report features, 4) developing import features. Melakukan kajian manfaat BIM pada perusahaan besar kontraktor dan konsultan teknik di DKI Jakarta yang telah menerapkan BIM dalam proses komunikasi. The system designed and built has the features of recording tasks per project, timeline and sprints. Therefore, a system management information system was designed using the Web-based Nest.Js software. Rancang Bangun Sistem Informasi Kolaboratif Berbasis Web Untuk. From the research conducted, it was found that the process of monitoring a task or task on a project or product is due to the current information system being less supportive and some still using manual records. Software development method used is Exterme Programming. Data collection techniques used are literature study, observation and interview. The research method used is descriptive qualitative method. This study aims to analyze, design and build a management information system at PT.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |